Applicable Phase: Major Phase
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...




Pending Application Submittal
E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN
E.47a.Shuttle Bus System Operate shuttle bu...




A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999. Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47b.Transit Pass Sales Sell transit passe...




See Implementation Notes for E.47a.
E.47c.Employee Transportation Subsidies Pro...




See Implementation Notes for E.47a.
E.47e.Secure Bicycle Parking Provide secure...




See Implementation Notes for E.47a.
E.47f.Appropriate Street Lighting. Ensure t...




See Implementation Notes for E.47a.
E.47g.Transit, Pedestrian and Bicycle Route In...




See Implementation Notes for E.47a.
E.47h.Parking Management Guidelines Establi...




See Implementation Notes for E.47a.
E.47I.Flexible Work Time/Telecommuting Wher...




See Implementation Notes for E.47a.
E.49 FERRY SERVICE
E.49.Ferry Service Make a good faith effor...




Pending Application Submittal
F.05 DRY CLEANING FACILITIES
F.05.Prohibit dry cleaning facilities that co...




Pending Application Submittal
F.06 CHILD-CARE BUFFER ZONES
F.06.Require preschool and childcare centers ...




Pending Application Submittal
H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN
H.03b.In addition to the Project Area-wide pla...




Pending Application Submittal
H.05 NEW FIRE STATION
H.05.At the time the San Francisco Fire Depar...




See Compliance Notes for E.47.
M.01 TRANSFER SCHOOL SITE
M.01.Transfer the 2.02 acre school site to th...




Pending Application Submittal
M.06 CONSTRUCT NEW FIRE STATION AND PROVIDE NEW ENGINE COMPANY
M.06a.Construct New Fire Station Construct or...




Timing of implementation triggered by City Fire Department review of cumulative development.
M.06b.Provide New Engine Company Provide or p...




Timing of implementation triggered by City Fire Department review of cumulative development.


Applicable Phase: Tentative Map
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
H.07 CORROSIVITY
H.07.Test soils for sulfate and chloride cont...




Pending Application Submittal
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...




A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...




See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...




See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...




See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...




See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...




See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...




See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...




See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...




See Implementation Notes for K.01a.
K.03 SEWER IMPROVEMENT DESIGN
K.03.Design and construct sewer improvements ...




Pending Application Submittal
K.04 ALTERNATIVE TECHNOLOGIES TO IMPROVE STORMWATER DISCHARGE QUALITY
K.04.Implement alternative technologies or us...




Pending Application Submittal
K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING
K.06.Structures in the Project Area should be...




Pending Application Submittal
K.06a.Setback from the water’s edge...




Pending Application Submittal
K.06b.Install seawalls, dikes, and/or berms du...




Pending Application Submittal
K.06c.Provide for dewatering basements...




Pending Application Submittal
K.06d.Construct streets and sidewalks above ex...




Pending Application Submittal
K.06e.Use topsoil to raise the level of public...




Pending Application Submittal
K.06f.Use half-basements and partially depress...




Pending Application Submittal
M.04 SEWERS AND WASTEWATER TREATMENT
M.04.Construct a fence around any interim sur...




Pending Application Submittal
M.05 STORMWATER RUNOFF CONTROL AND DRAINAGE
M.05.Drain stormwater runoff (up to a 5-year ...




Pending Application Submittal


Applicable Phase: Project Level Review
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.01 LIGHTING AND GLARE
D.01.Design parking structure lighting to min...




Pending Application Submittal
D.07 PEDESTRIAN-LEVEL WINDS
D.07.Require a qualified wind consultant to r...




Pending Application Submittal
D.08 SHADOWS
D.08.The Redevelopment Plan documents would r...




Pending Application Submittal
G.01 NOISE REDUCTION IN PILE DRIVING
G.01.Use noise-reducing pile driving techniqu...




Pending Application Submittal
K.02 CHANGES IN SANITARY SEWAGE QUALITY
K.02.In addition to developing and implementi...




Pending Application Submittal
M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION
M.02.Include methods of water conservation in...




Pending Application Submittal
M.02a.Install water conserving dishwashers and...




Pending Application Submittal
M.02b.Install water conserving dishwashers and...




Pending Application Submittal
M.02c.Incorporate water efficient laboratory t...




Pending Application Submittal
M.02d.Provide information to residences and bu...




Pending Application Submittal
M.02e.Install water conserving irrigation syst...




Pending Application Submittal
M.02f.Design landscaping using drought resiste...




Pending Application Submittal


Applicable Phase: Improvement Plan - Plan Check
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
J.01 RISK MANAGEMENT PLAN(S)
J.01l.Post-Development Except where testing d...




See Implementation Notes for J.01a.
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...




A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...




See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...




See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...




See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...




See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...




See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...




See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...




See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...




See Implementation Notes for K.01a.


Applicable Phase: Building Site Permit
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...




Pending Application Submittal
F.02 CONSTRUCTION PM
F.02.As conditions of construction contracts,...




Pending Application Submittal
F.02a.Water all active construction areas at l...




Pending Application Submittal
F.02b.Use tarpaulins or other effective covers...




Pending Application Submittal
F.02c.Pave, apply water three times daily, or ...




Pending Application Submittal
F.02d.Sweep all paved access routes, parking a...




Pending Application Submittal
F.02e.Sweep streets daily (preferably with wat...




Pending Application Submittal
F.02f.Hydroseed or apply (non-toxic) soil stab...




Pending Application Submittal
F.02g.Enclose, cover, water twice daily or app...




Pending Application Submittal
F.02h.Limit traffic speeds on unpaved roads to...




Pending Application Submittal
F.02I.Install sandbags or other erosion contro...




Pending Application Submittal
F.02j.Replant vegetation in disturbed areas as...




Pending Application Submittal
F.02k.Install wheel washers for all exiting tr...




Pending Application Submittal
F.02l.Install wind breaks, or plant trees / ve...




Pending Application Submittal
F.02m.Suspend excavation and grading on large ...




Pending Application Submittal
F.02n.Limit the area subject to excavation, gr...




Pending Application Submittal
J.01 RISK MANAGEMENT PLAN(S)
J.01a.RMP Enforcement Provide an enforcement ...




Timing of implementation triggered by City Fire Department review of cumulative development.
J.01b.Pre-Development Include, at a minimum...




See Implementation Notes for J.01a.
J.01c.For areas where ITLs are exceeded, ident...




See Implementation Notes for J.01a.
J.01d.Development Include in the RMP, health ...




See Implementation Notes for J.01a.
J.01e.Identify site access controls to be impl...




See Implementation Notes for J.01a.
J.01f.Identify protocols for managing soil dur...




See Implementation Notes for J.01a.
J.01g.Identify protocols for managing groundwa...




See Implementation Notes for J.01a.
J.01h.Include SWPPP requirements and BMPs as d...




See Implementation Notes for J.01a.
J.01I.Include a requirement that construction ...




See Implementation Notes for J.01a.
J.01j.Develop and describe procedures for impl...




See Implementation Notes for J.01a.
J.01k.Establish procedures, as necessary, so t...




See Implementation Notes for J.01a.


Applicable Phase: Cert. Of Occupancy
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
F.03 TOXIC AIR CONTAMINANTS (TACs)
F.03.Prior to issuing a certificate of occupa...




Pending Application Submittal
H.01 HEAVY EQUIPMENT STORAGE
H.01.During the build-out period, store heavy...




Pending Application Submittal
H.02 EMERGENCY PREPAREDNESS AND EMERGENCY RESPONSE
H.02.Following build-out, coordinate emergenc...




Pending Application Submittal
J.01 RISK MANAGEMENT PLAN(S)
J.01m.Prohibit residences with unrestricted ac...




See Implementation Notes for J.01a.
J.01n.Prohibit access to native soils for priv...




See Implementation Notes for J.01a.
J.01o.Prohibit the use of shallow groundwater ...




See Implementation Notes for J.01a.