Mission Bay
San Francisco, CA

Block Summary Report

Block: N01
Click here to view a Printable Summary Report.
If you do not have Adobe Acrobat Reader, please click on the link to download the free plug-in.

Applicable Phase: Major Phase
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
9/25/2000
10/16/2000

6/22/2000

6/22/2000
Pending City Action
E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN
E.47a.Shuttle Bus System Operate shuttle bu...
9/13/2000
10/16/2000

5/4/1999

5/4/1999
A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999. Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47b.Transit Pass Sales Sell transit passe...
9/25/2000
10/16/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47c.Employee Transportation Subsidies Pro...
9/25/2000
10/16/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47e.Secure Bicycle Parking Provide secure...
9/25/2000
10/16/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47h.Parking Management Guidelines Establi...
9/25/2000
10/16/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47I.Flexible Work Time/Telecommuting Wher...
9/25/2000
10/16/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
F.01 TSM MEASURES
F.01.Implement measures to decrease vehicle t...
9/13/2000
10/16/2000

5/4/1999

5/4/1999
Periodic Reports submitted on an ongoing basis


Applicable Phase: Tentative Map
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.01 THIRD STREET/KING STREET
E.01b.Reconfigure the existing traffic signal....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.01c.Install “Don’t Block the Box” signs....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.08 FOURTH STREET/KING STREET
E.08b.Reconfigure the existing traffic signal....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.08c.Install “Don’t Block the Box” signs....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.36 THIRD STREET/TOWNSEND STREET
E.36a.Remove the on-street parking on the west...
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.36b.Provide an additional westbound through ...
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.38 FOURTH STREET/KING STREET
E.38.Widen the southbound approach to provide...
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.41 FOURTH STREET
E.41.Widen the west side of Fourth Street for...
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
F.01 TSM MEASURES
F.01.Implement measures to decrease vehicle t...
9/13/2000
10/16/2000

5/4/1999

5/4/1999
Periodic Reports submitted on an ongoing basis
H.07 CORROSIVITY
H.07.Test soils for sulfate and chloride cont...
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...
9/25/2000
9/13/2000

1/25/2001
A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.03 SEWER IMPROVEMENT DESIGN
K.03.Design and construct sewer improvements ...
10/3/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.04 ALTERNATIVE TECHNOLOGIES TO IMPROVE STORMWATER DISCHARGE QUALITY
K.04.Implement alternative technologies or us...
10/3/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING
K.06.Structures in the Project Area should be...
10/3/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.06c.Provide for dewatering basements...
10/3/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.06f.Use half-basements and partially depress...
10/3/2000
9/13/2000

1/25/2001
Pending Construction and Inspection


Applicable Phase: Project Level Review
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.01 LIGHTING AND GLARE
D.01.Design parking structure lighting to min...




Pending Construction and Inspection
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
9/25/2000
10/16/2000

6/22/2000

6/22/2000
Pending City Action
D.07 PEDESTRIAN-LEVEL WINDS
D.07.Require a qualified wind consultant to r...
10/10/2000
10/16/2000

8/3/2000
Pending Construction and Inspection
G.01 NOISE REDUCTION IN PILE DRIVING
G.01.Use noise-reducing pile driving techniqu...




Pending Building Site Permit(s)
K.02 CHANGES IN SANITARY SEWAGE QUALITY
K.02.In addition to developing and implementi...




Pending City Action
M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION
M.02a.Install water conserving dishwashers and...




Pending Construction and Inspection
M.02e.Install water conserving irrigation syst...




Pending Construction and Inspection
M.02f.Design landscaping using drought resiste...




Pending Construction and Inspection


Applicable Phase: Improvement Plan - Plan Check
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.01 THIRD STREET/KING STREET
E.01b.Reconfigure the existing traffic signal....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.01c.Install “Don’t Block the Box” signs....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
E.08 FOURTH STREET/KING STREET
E.08b.Reconfigure the existing traffic signal....
10/2/2000
9/13/2000

1/25/2001
Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...
9/25/2000
9/13/2000

1/25/2001
A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...
9/25/2000
9/13/2000

1/25/2001
See Implementation Notes for K.01a.


Applicable Phase: Building Site Permit
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM
D.04.Develop archaeological exploration progr...
10/3/2000
10/16/2000

6/22/2000

6/22/2000
Pending City Action
D.04a.Define specific research parameters and ...



6/22/2000

6/22/2000
Pending City Action
D.04b.Examine large-scale exposure of soil pro...



6/22/2000

6/22/2000
Pending City Action
D.04c.Complete detailed field records, includi...



6/22/2000

6/22/2000
Pending City Action
D.04d.Complete a detailed report of findings t...



6/22/2000

6/22/2000
Pending City Action
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...
9/25/2000
10/16/2000

6/22/2000

6/22/2000
Pending City Action
F.02 CONSTRUCTION PM
F.02.As conditions of construction contracts,...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02a.Water all active construction areas at l...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02b.Use tarpaulins or other effective covers...
10/3/2000


1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02c.Pave, apply water three times daily, or ...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02d.Sweep all paved access routes, parking a...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02e.Sweep streets daily (preferably with wat...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02f.Hydroseed or apply (non-toxic) soil stab...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02g.Enclose, cover, water twice daily or app...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02h.Limit traffic speeds on unpaved roads to...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02I.Install sandbags or other erosion contro...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02j.Replant vegetation in disturbed areas as...
10/3/2000
10/13/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02k.Install wheel washers for all exiting tr...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02l.Install wind breaks, or plant trees / ve...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02m.Suspend excavation and grading on large ...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
F.02n.Limit the area subject to excavation, gr...
10/3/2000
10/16/2000

1/25/2001
Conditioned on Subdivision Map and/or Improvement Plans
J.01 RISK MANAGEMENT PLAN(S)
J.01.Prior to any site development activities...
10/6/2000
10/16/2000

5/25/1999

5/25/1999
Completed
J.01a.RMP Enforcement Provide an enforcement ...
10/6/2000
10/16/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01c.For areas where ITLs are exceeded, ident...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01f.Identify protocols for managing soil dur...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01g.Identify protocols for managing groundwa...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01h.Include SWPPP requirements and BMPs as d...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01j.Develop and describe procedures for impl...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01k.Establish procedures, as necessary, so t...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.


Applicable Phase: Cert. Of Occupancy
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
F.03 TOXIC AIR CONTAMINANTS (TACs)
F.03.Prior to issuing a certificate of occupa...




Pending Written Verification
H.01 HEAVY EQUIPMENT STORAGE
H.01.During the build-out period, store heavy...




Pending Work Plan Submittal
H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN
H.03a.Require the formulation of a comprehensi...

5/2001
7/31/2001

Submitted May 2001
H.03b.In addition to the Project Area-wide pla...
9/25/2000
10/16/2000


Pending Building Construction
J.01 RISK MANAGEMENT PLAN(S)
J.01m.Prohibit residences with unrestricted ac...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01n.Prohibit access to native soils for priv...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.
J.01o.Prohibit the use of shallow groundwater ...
10/6/2000
10/16/2000

5/25/1999
See Implementation Notes for J.01a.