Mission Bay
San Francisco, CA

Block Summary Report

Block: N02
Click here to view a Printable Summary Report.
If you do not have Adobe Acrobat Reader, please click on the link to download the free plug-in.

Applicable Phase: Major Phase
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
10/19/2000
10/3/2000

6/9/2000

6/9/2000
Pending City Action
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...
9/12/2000
10/3/2000

6/9/2000

6/9/2000
Pending City Action
E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN
E.47a.Shuttle Bus System Operate shuttle bu...
9/14/2000
10/3/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47c.Employee Transportation Subsidies Pro...
9/14/2000
10/3/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47g.Transit, Pedestrian and Bicycle Route In...
9/14/2000
10/3/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47h.Parking Management Guidelines Establi...
9/14/2000
10/3/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47I.Flexible Work Time/Telecommuting Wher...
9/14/2000
10/3/2000

5/4/1999

5/4/1999
Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
F.06 CHILD-CARE BUFFER ZONES
F.06.Require preschool and childcare centers ...
10/19/2000
10/3/2000

8/28/2000
Pending City Action


Applicable Phase: Tentative Map
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.01 THIRD STREET/KING STREET
E.01b.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.01c.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.02 THIRD STREET/BERRY STREET
E.02a.Restripe the northbound approach to prov...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.02c.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.08 FOURTH STREET/KING STREET
E.08b.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.08c.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09 FOURTH STREET/BERRY STREET
E.09a.Restripe the westbound approach to provi...
10/24/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09b.Restripe the northbound approach to prov...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09c.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09d.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.21 THIRD STREET
E.21a.Widen the west side of Third Street betw...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.23 FOURTH STREET
E.23a.Widen Fourth Street between China Basin ...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.24 KING STREET
E.24a.Widen eastbound King Street between Fift...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.24b.Construct westbound King Street frontage...
10/23/2000
10/3/2000

8/28/2000
Pending Construction and Inspection
H.07 CORROSIVITY
H.07.Test soils for sulfate and chloride cont...
10/19/2000
10/3/2000

8/28/2000
Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01.Develop and implement a comprehensive St...
10/19/2000
10/3/2000

8/28/2000
A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01a.Minimize dust during demolition, grading...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01b.Minimize wind and water erosion on tempo...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01c.Minimize the area and length of time dur...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01d.Prevent the release of construction poll...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01e.As needed, install filter fences around ...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01f.Follow design and construction standards...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01g.Install and maintain sediment and oil an...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01h.Clean wheels and cover loads of trucks c...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01I.Implement a hazardous material spill pre...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP


Applicable Phase: Project Level Review
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.01 LIGHTING AND GLARE
D.01.Design parking structure lighting to min...
9/12/2000
10/3/2000


Not applicable
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
10/19/2000
10/3/2000

6/9/2000

6/9/2000
Pending City Action
D.07 PEDESTRIAN-LEVEL WINDS
D.07.Require a qualified wind consultant to r...
9/12/2000
10/3/2000


Pending Construction and Inspection
M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION
M.02.Include methods of water conservation in...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02a.Install water conserving dishwashers and...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02b.Install water conserving dishwashers and...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02c.Incorporate water efficient laboratory t...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02d.Provide information to residences and bu...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02e.Install water conserving irrigation syst...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection
M.02f.Design landscaping using drought resiste...
10/19/2000
10/3/2000

10/5/2000
Pending Construction and Inspection


Applicable Phase: Improvement Plan - Plan Check
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.01 THIRD STREET/KING STREET
E.01b.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.01c.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.02 THIRD STREET/BERRY STREET
E.02a.Restripe the northbound approach to prov...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.02c.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.08 FOURTH STREET/KING STREET
E.08b.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09 FOURTH STREET/BERRY STREET
E.09a.Restripe the westbound approach to provi...
10/24/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09b.Restripe the northbound approach to prov...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09c.Reconfigure the existing traffic signal....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.09d.Install “Don’t Block the Box” signs....
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.21 THIRD STREET
E.21a.Widen the west side of Third Street betw...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
E.23 FOURTH STREET
E.23a.Widen Fourth Street between China Basin ...
10/23/2000
8/12/1999

8/28/2000
Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01.Develop and implement a comprehensive St...
10/19/2000
10/3/2000

8/28/2000
A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01a.Minimize dust during demolition, grading...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01b.Minimize wind and water erosion on tempo...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01c.Minimize the area and length of time dur...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01d.Prevent the release of construction poll...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01e.As needed, install filter fences around ...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01f.Follow design and construction standards...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01g.Install and maintain sediment and oil an...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01h.Clean wheels and cover loads of trucks c...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP
K.01I.Implement a hazardous material spill pre...
10/19/2000
10/3/2000

8/28/2000
Pending Submission of Site Specific SWPPP


Applicable Phase: Building Site Permit
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM
D.04.Develop archaeological exploration progr...
9/12/2000
8/12/1999

6/9/2000

6/9/2000
Pending City Action
D.04a.Define specific research parameters and ...
9/12/2000
8/12/1999

6/9/2000

6/9/2000
Pending City Action
D.04b.Examine large-scale exposure of soil pro...
9/12/2000
8/12/1999

6/9/2000

6/9/2000
Pending City Action
D.04c.Complete detailed field records, includi...
9/12/2000
8/12/1999

6/9/2000

6/9/2000
Pending City Action
D.04d.Complete a detailed report of findings t...
9/12/2000
8/12/1999

6/9/2000

6/9/2000
Pending City Action
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...
9/12/2000
10/3/2000

6/9/2000

6/9/2000
Pending City Action
F.02 CONSTRUCTION PM
F.02.As conditions of construction contracts,...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02a.Water all active construction areas at l...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02b.Use tarpaulins or other effective covers...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02c.Pave, apply water three times daily, or ...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02d.Sweep all paved access routes, parking a...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02e.Sweep streets daily (preferably with wat...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02f.Hydroseed or apply (non-toxic) soil stab...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02g.Enclose, cover, water twice daily or app...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02h.Limit traffic speeds on unpaved roads to...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02I.Install sandbags or other erosion contro...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02j.Replant vegetation in disturbed areas as...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02k.Install wheel washers for all exiting tr...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02l.Install wind breaks, or plant trees / ve...



8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02m.Suspend excavation and grading on large ...



8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
F.02n.Limit the area subject to excavation, gr...
10/19/2000
10/3/2000

8/28/2000
Conditioned on Subdivision Map and/or Improvement Plans
J.01 RISK MANAGEMENT PLAN(S)
J.01.Prior to any site development activities...
10/19/2000
10/3/2000

5/25/1999

5/25/1999
Completed
J.01a.RMP Enforcement Provide an enforcement ...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01b.Pre-Development Include, at a minimum...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01c.For areas where ITLs are exceeded, ident...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01d.Development Include in the RMP, health ...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01e.Identify site access controls to be impl...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01f.Identify protocols for managing soil dur...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01g.Identify protocols for managing groundwa...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01h.Include SWPPP requirements and BMPs as d...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01I.Include a requirement that construction ...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01j.Develop and describe procedures for impl...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01k.Establish procedures, as necessary, so t...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.


Applicable Phase: Cert. Of Occupancy
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
F.03 TOXIC AIR CONTAMINANTS (TACs)
F.03.Prior to issuing a certificate of occupa...




Pending Written Verification
H.01 HEAVY EQUIPMENT STORAGE
H.01.During the build-out period, store heavy...




Pending Work Plan Submittal
H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN
H.03a.Require the formulation of a comprehensi...
10/19/2000
5/2001
7/31/2001

Submitted May 2001
H.03b.In addition to the Project Area-wide pla...
10/19/2000
10/3/2000


Pending Building Construction
J.01 RISK MANAGEMENT PLAN(S)
J.01m.Prohibit residences with unrestricted ac...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01n.Prohibit access to native soils for priv...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01o.Prohibit the use of shallow groundwater ...
10/19/2000
10/3/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.