| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 10/19/2000
 | 10/3/2000
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/12/2000
 | 10/3/2000
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN |
| E.47a. | Shuttle Bus System
Operate shuttle bu...
 | 9/14/2000
 | 10/3/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47c. | Employee Transportation Subsidies
Pro...
 | 9/14/2000
 | 10/3/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47g. | Transit, Pedestrian and Bicycle Route In...
 | 9/14/2000
 | 10/3/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47h. | Parking Management Guidelines
Establi...
 | 9/14/2000
 | 10/3/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47I. | Flexible Work Time/Telecommuting
Wher...
 | 9/14/2000
 | 10/3/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| F.06 CHILD-CARE BUFFER ZONES |
| F.06. | Require preschool and childcare centers ...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending City Action
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.01 THIRD STREET/KING STREET |
| E.01b. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.01c. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.02 THIRD STREET/BERRY STREET |
| E.02a. | Restripe the northbound approach to prov...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.02c. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.08 FOURTH STREET/KING STREET |
| E.08b. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.08c. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/24/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.21 THIRD STREET |
| E.21a. | Widen the west side of Third Street betw...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.24 KING STREET |
| E.24a. | Widen eastbound King Street between Fift...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.24b. | Construct westbound King Street frontage...
 | 10/23/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| H.07 CORROSIVITY |
| H.07. | Test soils for sulfate and chloride cont...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.01 LIGHTING AND GLARE |
| D.01. | Design parking structure lighting to min...
 | 9/12/2000
 | 10/3/2000
 |
 |
 | Not applicable
 |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 10/19/2000
 | 10/3/2000
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.07 PEDESTRIAN-LEVEL WINDS |
| D.07. | Require a qualified wind consultant to r...
 | 9/12/2000
 | 10/3/2000
 |
 |
 | Pending Construction and Inspection
 |
| M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION |
| M.02. | Include methods of water conservation in...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02a. | Install water conserving dishwashers and...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02b. | Install water conserving dishwashers and...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02c. | Incorporate water efficient laboratory t...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02d. | Provide information to residences and bu...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02e. | Install water conserving irrigation syst...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| M.02f. | Design landscaping using drought resiste...
 | 10/19/2000
 | 10/3/2000
 |
 | 10/5/2000
 | Pending Construction and Inspection
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.01 THIRD STREET/KING STREET |
| E.01b. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.01c. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.02 THIRD STREET/BERRY STREET |
| E.02a. | Restripe the northbound approach to prov...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.02c. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.08 FOURTH STREET/KING STREET |
| E.08b. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/24/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.21 THIRD STREET |
| E.21a. | Widen the west side of Third Street betw...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/23/2000
 | 8/12/1999
 |
 | 8/28/2000
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Pending Submission of Site Specific SWPPP
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM |
| D.04. | Develop archaeological exploration progr...
 | 9/12/2000
 | 8/12/1999
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.04a. | Define specific research parameters and ...
 | 9/12/2000
 | 8/12/1999
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.04b. | Examine large-scale exposure of soil pro...
 | 9/12/2000
 | 8/12/1999
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.04c. | Complete detailed field records, includi...
 | 9/12/2000
 | 8/12/1999
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.04d. | Complete a detailed report of findings t...
 | 9/12/2000
 | 8/12/1999
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/12/2000
 | 10/3/2000
 |
 | 6/9/2000
 | 6/9/2000 Pending City Action
 |
| F.02 CONSTRUCTION PM |
| F.02. | As conditions of construction contracts,...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02a. | Water all active construction areas at l...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02b. | Use tarpaulins or other effective covers...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02c. | Pave, apply water three times daily, or ...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02d. | Sweep all paved access routes, parking a...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02e. | Sweep streets daily (preferably with wat...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02f. | Hydroseed or apply (non-toxic) soil stab...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02g. | Enclose, cover, water twice daily or app...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02h. | Limit traffic speeds on unpaved roads to...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02I. | Install sandbags or other erosion contro...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02j. | Replant vegetation in disturbed areas as...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02k. | Install wheel washers for all exiting tr...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02l. | Install wind breaks, or plant trees / ve...
 |
 |
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02m. | Suspend excavation and grading on large ...
 |
 |
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| F.02n. | Limit the area subject to excavation, gr...
 | 10/19/2000
 | 10/3/2000
 |
 | 8/28/2000
 | Conditioned on Subdivision Map and/or Improvement Plans
 |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01. | Prior to any site development activities...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | 5/25/1999 Completed
 |
| J.01a. | RMP Enforcement
Provide an enforcement ...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01b. | Pre-Development
Include, at a minimum...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01c. | For areas where ITLs are exceeded, ident...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01d. | Development
Include in the RMP, health ...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01e. | Identify site access controls to be impl...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01f. | Identify protocols for managing soil dur...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01g. | Identify protocols for managing groundwa...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01h. | Include SWPPP requirements and BMPs as d...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01I. | Include a requirement that construction ...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01j. | Develop and describe procedures for impl...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01k. | Establish procedures, as necessary, so t...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| F.03 TOXIC AIR CONTAMINANTS (TACs) |
| F.03. | Prior to issuing a certificate of occupa...
 |
 |
 |
 |
 | Pending Written Verification
 |
| H.01 HEAVY EQUIPMENT STORAGE |
| H.01. | During the build-out period, store heavy...
 |
 |
 |
 |
 | Pending Work Plan Submittal
 |
| H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN |
| H.03a. | Require the formulation of a comprehensi...
 | 10/19/2000
 | 5/2001
 | 7/31/2001
 |
 | Submitted May 2001
 |
| H.03b. | In addition to the Project Area-wide pla...
 | 10/19/2000
 | 10/3/2000
 |
 |
 | Pending Building Construction
 |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01m. | Prohibit residences with unrestricted ac...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01n. | Prohibit access to native soils for priv...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01o. | Prohibit the use of shallow groundwater ...
 | 10/19/2000
 | 10/3/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |