| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN |
| E.47. | Prepare a TSM Plan, which could include ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999. Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47a. | Shuttle Bus System
Operate shuttle bu...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47b. | Transit Pass Sales
Sell transit passe...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47c. | Employee Transportation Subsidies
Pro...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47e. | Secure Bicycle Parking
Provide secure...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47f. | Appropriate Street Lighting.
Ensure t...
 | 10/10/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47g. | Transit, Pedestrian and Bicycle Route In...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| E.47h. | Parking Management Guidelines
Establi...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of specific measures may be applied to individual sites.
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.08 FOURTH STREET/KING STREET |
| E.08a. | Widen the eastbound approach to provide ...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.08b. | Reconfigure the existing traffic signal....
 | 9/25/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.08c. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/16/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19 FIFTH STREET/KING STREET |
| E.19a. | Narrow approximately 250 feet of the med...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19b. | Restripe the I-280 off-ramp touchdown an...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.24 KING STREET |
| E.24a. | Widen eastbound King Street between Fift...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.24b. | Construct westbound King Street frontage...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.28 MUNI LINE 30-STOCKTON OR 45-UNION/STOCKTON |
| E.28a. | Construct Mission Bay Street, the Sevent...
 | 9/21/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| H.07 CORROSIVITY |
| H.07. | Test soils for sulfate and chloride cont...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.03 SEWER IMPROVEMENT DESIGN |
| K.03. | Design and construct sewer improvements ...
 |
 |
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING |
| K.06. | Structures in the Project Area should be...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06a. | Setback from the water’s edge...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06c. | Provide for dewatering basements...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06d. | Construct streets and sidewalks above ex...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06e. | Use topsoil to raise the level of public...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06f. | Use half-basements and partially depress...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.01 LIGHTING AND GLARE |
| D.01. | Design parking structure lighting to min...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.07 PEDESTRIAN-LEVEL WINDS |
| D.07. | Require a qualified wind consultant to r...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| D.08 SHADOWS |
| D.08. | The Redevelopment Plan documents would r...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| G.01 NOISE REDUCTION IN PILE DRIVING |
| G.01. | Use noise-reducing pile driving techniqu...
 |
 |
 |
 |
 | Pending Building Site Permit(s)
 |
| L.02 WETLAND HABITAT AVOIDANCE |
| L.02. | Avoid salt marsh wetland habitat along t...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.04 TURBIDITY PREVENTION |
| L.04. | Require the construction contractor to u...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.05 CONSTRUCTION IN CHANNEL |
| L.05. | Confine resuspended sediments from const...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION |
| M.02a. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02b. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02c. | Incorporate water efficient laboratory t...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02d. | Provide information to residences and bu...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02e. | Install water conserving irrigation syst...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02f. | Design landscaping using drought resiste...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.08 FOURTH STREET/KING STREET |
| E.08a. | Widen the eastbound approach to provide ...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.08b. | Reconfigure the existing traffic signal....
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/16/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.19 FIFTH STREET/KING STREET |
| E.19a. | Narrow approximately 250 feet of the med...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.19b. | Restripe the I-280 off-ramp touchdown an...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.19c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/10/2000
 | 10/26/2000
 |
 |
 | Pending Submission of Site Specific SWPPP
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM |
| D.04. | Develop archaeological exploration progr...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.04a. | Define specific research parameters and ...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.04b. | Examine large-scale exposure of soil pro...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.04c. | Complete detailed field records, includi...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.04d. | Complete a detailed report of findings t...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/25/2000
 | 10/26/2000
 |
 | 12/23/2000
 | 12/23/2000 Pending City Action
 |
| F.02 CONSTRUCTION PM |
| F.02a. | Water all active construction areas at l...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02b. | Use tarpaulins or other effective covers...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02c. | Pave, apply water three times daily, or ...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02d. | Sweep all paved access routes, parking a...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02e. | Sweep streets daily (preferably with wat...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02f. | Hydroseed or apply (non-toxic) soil stab...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02g. | Enclose, cover, water twice daily or app...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02h. | Limit traffic speeds on unpaved roads to...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02I. | Install sandbags or other erosion contro...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02j. | Replant vegetation in disturbed areas as...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02k. | Install wheel washers for all exiting tr...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02l. | Install wind breaks, or plant trees / ve...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| F.02m. | Suspend excavation and grading on large ...
 | 10/11/2000
 | 10/26/2000
 |
 |
 | Pending Construction and Inspection
 |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01. | Prior to any site development activities...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | 5/25/1999 Completed
 |
| J.01a. | RMP Enforcement
Provide an enforcement ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01b. | Pre-Development
Include, at a minimum...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01c. | For areas where ITLs are exceeded, ident...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01d. | Development
Include in the RMP, health ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01e. | Identify site access controls to be impl...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01f. | Identify protocols for managing soil dur...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01g. | Identify protocols for managing groundwa...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01h. | Include SWPPP requirements and BMPs as d...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01j. | Develop and describe procedures for impl...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01k. | Establish procedures, as necessary, so t...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |