Mission Bay
San Francisco, CA

Block Summary Report

Block: N04a
Click here to view a Printable Summary Report.
If you do not have Adobe Acrobat Reader, please click on the link to download the free plug-in.

Applicable Phase: Major Phase
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN
E.47.Prepare a TSM Plan, which could include ...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999. Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47a.Shuttle Bus System Operate shuttle bu...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47b.Transit Pass Sales Sell transit passe...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47c.Employee Transportation Subsidies Pro...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47e.Secure Bicycle Parking Provide secure...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47f.Appropriate Street Lighting. Ensure t...
10/10/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47g.Transit, Pedestrian and Bicycle Route In...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.
E.47h.Parking Management Guidelines Establi...
9/25/2000
10/26/2000

5/4/1999

5/4/1999
Implementation of specific measures may be applied to individual sites.


Applicable Phase: Tentative Map
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.08 FOURTH STREET/KING STREET
E.08a.Widen the eastbound approach to provide ...
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.08b.Reconfigure the existing traffic signal....
9/25/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.08c.Install “Don’t Block the Box” signs....
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.09 FOURTH STREET/BERRY STREET
E.09a.Restripe the westbound approach to provi...
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.09b.Restripe the northbound approach to prov...
10/16/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.09c.Reconfigure the existing traffic signal....
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.09d.Install “Don’t Block the Box” signs....
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.19 FIFTH STREET/KING STREET
E.19a.Narrow approximately 250 feet of the med...
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.19b.Restripe the I-280 off-ramp touchdown an...
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.19c.Reconfigure the existing traffic signal....
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.23 FOURTH STREET
E.23a.Widen Fourth Street between China Basin ...
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.24 KING STREET
E.24a.Widen eastbound King Street between Fift...
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.24b.Construct westbound King Street frontage...
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
E.28 MUNI LINE 30-STOCKTON OR 45-UNION/STOCKTON
E.28a.Construct Mission Bay Street, the Sevent...
9/21/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
H.07 CORROSIVITY
H.07.Test soils for sulfate and chloride cont...
10/10/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01.Develop and implement a comprehensive St...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01a.Minimize dust during demolition, grading...
10/10/2000
10/26/2000

2/14/2001
A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01c.Minimize the area and length of time dur...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01d.Prevent the release of construction poll...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01e.As needed, install filter fences around ...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01f.Follow design and construction standards...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01g.Install and maintain sediment and oil an...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01h.Clean wheels and cover loads of trucks c...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.01I.Implement a hazardous material spill pre...
10/10/2000
10/26/2000

2/14/2001
Pending Submission of Site Specific SWPPP
K.03 SEWER IMPROVEMENT DESIGN
K.03.Design and construct sewer improvements ...



2/14/2001
Pending Construction and Inspection
K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING
K.06.Structures in the Project Area should be...
10/11/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.06a.Setback from the water’s edge...
10/19/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.06c.Provide for dewatering basements...
10/19/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.06d.Construct streets and sidewalks above ex...
10/19/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.06e.Use topsoil to raise the level of public...
10/19/2000
10/26/2000

2/14/2001
Pending Construction and Inspection
K.06f.Use half-basements and partially depress...
10/19/2000
10/26/2000

2/14/2001
Pending Construction and Inspection


Applicable Phase: Project Level Review
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.01 LIGHTING AND GLARE
D.01.Design parking structure lighting to min...
9/25/2000
10/26/2000


Pending Design Submission
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.07 PEDESTRIAN-LEVEL WINDS
D.07.Require a qualified wind consultant to r...
9/25/2000
10/26/2000


Pending Design Submission
D.08 SHADOWS
D.08.The Redevelopment Plan documents would r...
9/25/2000
10/26/2000


Pending Design Submission
G.01 NOISE REDUCTION IN PILE DRIVING
G.01.Use noise-reducing pile driving techniqu...




Pending Building Site Permit(s)
L.02 WETLAND HABITAT AVOIDANCE
L.02.Avoid salt marsh wetland habitat along t...




Improvements will not involve work in the Channel
L.04 TURBIDITY PREVENTION
L.04.Require the construction contractor to u...




Improvements will not involve work in the Channel
L.05 CONSTRUCTION IN CHANNEL
L.05.Confine resuspended sediments from const...




Improvements will not involve work in the Channel
M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION
M.02a.Install water conserving dishwashers and...




Pending Site Permit(s)
M.02b.Install water conserving dishwashers and...




Pending Site Permit(s)
M.02c.Incorporate water efficient laboratory t...




Pending Site Permit(s)
M.02d.Provide information to residences and bu...




Pending Site Permit(s)
M.02e.Install water conserving irrigation syst...




Pending Site Permit(s)
M.02f.Design landscaping using drought resiste...




Pending Site Permit(s)


Applicable Phase: Improvement Plan - Plan Check
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.08 FOURTH STREET/KING STREET
E.08a.Widen the eastbound approach to provide ...
10/10/2000
10/26/2000


Pending Construction and Inspection
E.08b.Reconfigure the existing traffic signal....
9/25/2000
10/26/2000


Pending Construction and Inspection
E.09 FOURTH STREET/BERRY STREET
E.09a.Restripe the westbound approach to provi...
10/10/2000
10/26/2000


Pending Construction and Inspection
E.09b.Restripe the northbound approach to prov...
10/16/2000
10/26/2000


Pending Construction and Inspection
E.09c.Reconfigure the existing traffic signal....
10/11/2000
10/26/2000


Pending Construction and Inspection
E.09d.Install “Don’t Block the Box” signs....
10/10/2000
10/26/2000


Pending Construction and Inspection
E.19 FIFTH STREET/KING STREET
E.19a.Narrow approximately 250 feet of the med...
10/11/2000
10/26/2000


Pending Construction and Inspection
E.19b.Restripe the I-280 off-ramp touchdown an...
10/11/2000
10/26/2000


Pending Construction and Inspection
E.19c.Reconfigure the existing traffic signal....
10/11/2000
10/26/2000


Pending Construction and Inspection
E.23 FOURTH STREET
E.23a.Widen Fourth Street between China Basin ...
10/11/2000
10/26/2000


Pending Construction and Inspection
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01.Develop and implement a comprehensive St...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01a.Minimize dust during demolition, grading...
10/10/2000
10/26/2000


A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01c.Minimize the area and length of time dur...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01d.Prevent the release of construction poll...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01e.As needed, install filter fences around ...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01f.Follow design and construction standards...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01g.Install and maintain sediment and oil an...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01h.Clean wheels and cover loads of trucks c...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP
K.01I.Implement a hazardous material spill pre...
10/10/2000
10/26/2000


Pending Submission of Site Specific SWPPP


Applicable Phase: Building Site Permit
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM
D.04.Develop archaeological exploration progr...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.04a.Define specific research parameters and ...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.04b.Examine large-scale exposure of soil pro...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.04c.Complete detailed field records, includi...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.04d.Complete a detailed report of findings t...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...
9/25/2000
10/26/2000

12/23/2000

12/23/2000
Pending City Action
F.02 CONSTRUCTION PM
F.02a.Water all active construction areas at l...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02b.Use tarpaulins or other effective covers...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02c.Pave, apply water three times daily, or ...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02d.Sweep all paved access routes, parking a...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02e.Sweep streets daily (preferably with wat...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02f.Hydroseed or apply (non-toxic) soil stab...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02g.Enclose, cover, water twice daily or app...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02h.Limit traffic speeds on unpaved roads to...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02I.Install sandbags or other erosion contro...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02j.Replant vegetation in disturbed areas as...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02k.Install wheel washers for all exiting tr...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02l.Install wind breaks, or plant trees / ve...
10/11/2000
10/26/2000


Pending Construction and Inspection
F.02m.Suspend excavation and grading on large ...
10/11/2000
10/26/2000


Pending Construction and Inspection
J.01 RISK MANAGEMENT PLAN(S)
J.01.Prior to any site development activities...
9/25/2000
10/26/2000

5/25/1999

5/25/1999
Completed
J.01a.RMP Enforcement Provide an enforcement ...
9/25/2000
10/26/2000

5/25/1999
Timing of implementation triggered by City Fire Department review of cumulative development.
J.01b.Pre-Development Include, at a minimum...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01c.For areas where ITLs are exceeded, ident...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01d.Development Include in the RMP, health ...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01e.Identify site access controls to be impl...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01f.Identify protocols for managing soil dur...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01g.Identify protocols for managing groundwa...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01h.Include SWPPP requirements and BMPs as d...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01j.Develop and describe procedures for impl...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01k.Establish procedures, as necessary, so t...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.


Applicable Phase: Cert. Of Occupancy
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
H.01 HEAVY EQUIPMENT STORAGE
H.01.During the build-out period, store heavy...




Pending Work Plan Submittal
H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN
H.03a.Require the formulation of a comprehensi...
9/25/2000
5/2001
7/31/2001

Submitted May 2001
J.01 RISK MANAGEMENT PLAN(S)
J.01m.Prohibit residences with unrestricted ac...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01n.Prohibit access to native soils for priv...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.
J.01o.Prohibit the use of shallow groundwater ...
9/25/2000
10/26/2000

5/25/1999
See Implementation Notes for J.01a.