| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN |
| E.47a. | Shuttle Bus System
Operate shuttle bu...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47b. | Transit Pass Sales
Sell transit passe...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47c. | Employee Transportation Subsidies
Pro...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47e. | Secure Bicycle Parking
Provide secure...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47f. | Appropriate Street Lighting.
Ensure t...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47g. | Transit, Pedestrian and Bicycle Route In...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47h. | Parking Management Guidelines
Establi...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.47I. | Flexible Work Time/Telecommuting
Wher...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.49 FERRY SERVICE |
| E.49. | Ferry Service
Make a good faith effor...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.05 DRY CLEANING FACILITIES |
| F.05. | Prohibit dry cleaning facilities that co...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.06 CHILD-CARE BUFFER ZONES |
| F.06. | Require preschool and childcare centers ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| H.03 COMPREHENSIVE PREPAREDNESS AND RESPONSE PLAN |
| H.03b. | In addition to the Project Area-wide pla...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| H.05 NEW FIRE STATION |
| H.05. | At the time the San Francisco Fire Depar...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.02 SITE SPECIFIC RISK EVALUATION |
| J.02. | Carry out a site-specific risk evaluatio...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.06 CONSTRUCT NEW FIRE STATION AND PROVIDE NEW ENGINE COMPANY |
| M.06a. | Construct New Fire Station
Construct or...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.06b. | Provide New Engine Company
Provide or p...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.30 SEVENTH STREET/TOWNSEND STREET |
| E.30a. | Restripe the southbound, eastbound, and ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.30b. | Restripe the northbound approach to prov...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.31 SEVENTH STREET/BERRY STREET |
| E.31a. | Restripe the eastbound approach to provi...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| E.31b. | Restripe the northbound approach to prov...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| H.07 CORROSIVITY |
| H.07. | Test soils for sulfate and chloride cont...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01a. | Minimize dust during demolition, grading...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01b. | Minimize wind and water erosion on tempo...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01c. | Minimize the area and length of time dur...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01d. | Prevent the release of construction poll...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01e. | As needed, install filter fences around ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01f. | Follow design and construction standards...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01g. | Install and maintain sediment and oil an...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01I. | Implement a hazardous material spill pre...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.03 SEWER IMPROVEMENT DESIGN |
| K.03. | Design and construct sewer improvements ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.04 ALTERNATIVE TECHNOLOGIES TO IMPROVE STORMWATER DISCHARGE QUALITY |
| K.04. | Implement alternative technologies or us...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING |
| K.06. | Structures in the Project Area should be...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06a. | Setback from the water’s edge...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06b. | Install seawalls, dikes, and/or berms du...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06c. | Provide for dewatering basements...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06d. | Construct streets and sidewalks above ex...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06e. | Use topsoil to raise the level of public...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.06f. | Use half-basements and partially depress...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.03 EXTEND AUXILIARY WATER SUPPLY SYSTEM |
| M.03. | Extend the Auxiliary Water Supply System...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.04 SEWERS AND WASTEWATER TREATMENT |
| M.04. | Construct a fence around any interim sur...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.05 STORMWATER RUNOFF CONTROL AND DRAINAGE |
| M.05. | Drain stormwater runoff (up to a 5-year ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.01 LIGHTING AND GLARE |
| D.01. | Design parking structure lighting to min...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| D.07 PEDESTRIAN-LEVEL WINDS |
| D.07. | Require a qualified wind consultant to r...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| D.08 SHADOWS |
| D.08. | The Redevelopment Plan documents would r...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| G.01 NOISE REDUCTION IN PILE DRIVING |
| G.01. | Use noise-reducing pile driving techniqu...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| G.02 ANALYZE POTENTIAL VIBRATIONS FROM CALTRAIN |
| G.02. | Analyze potential vibration from Caltrai...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.02 CHANGES IN SANITARY SEWAGE QUALITY |
| K.02. | In addition to developing and implementi...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION |
| M.02. | Include methods of water conservation in...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02a. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02b. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02c. | Incorporate water efficient laboratory t...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02d. | Provide information to residences and bu...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02e. | Install water conserving irrigation syst...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| M.02f. | Design landscaping using drought resiste...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01l. | Post-Development
Except where testing d...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01a. | Minimize dust during demolition, grading...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01b. | Minimize wind and water erosion on tempo...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01c. | Minimize the area and length of time dur...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01d. | Prevent the release of construction poll...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01e. | As needed, install filter fences around ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01f. | Follow design and construction standards...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01g. | Install and maintain sediment and oil an...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| K.01I. | Implement a hazardous material spill pre...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02 CONSTRUCTION PM |
| F.02. | As conditions of construction contracts,...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02a. | Water all active construction areas at l...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02b. | Use tarpaulins or other effective covers...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02c. | Pave, apply water three times daily, or ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02d. | Sweep all paved access routes, parking a...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02e. | Sweep streets daily (preferably with wat...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02f. | Hydroseed or apply (non-toxic) soil stab...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02g. | Enclose, cover, water twice daily or app...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02h. | Limit traffic speeds on unpaved roads to...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02I. | Install sandbags or other erosion contro...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02j. | Replant vegetation in disturbed areas as...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02k. | Install wheel washers for all exiting tr...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02l. | Install wind breaks, or plant trees / ve...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02m. | Suspend excavation and grading on large ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| F.02n. | Limit the area subject to excavation, gr...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01a. | RMP Enforcement
Provide an enforcement ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01b. | Pre-Development
Include, at a minimum...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01c. | For areas where ITLs are exceeded, ident...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01d. | Development
Include in the RMP, health ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01e. | Identify site access controls to be impl...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01f. | Identify protocols for managing soil dur...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01g. | Identify protocols for managing groundwa...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01h. | Include SWPPP requirements and BMPs as d...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01I. | Include a requirement that construction ...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01j. | Develop and describe procedures for impl...
 |
 |
 |
 |
 | Pending Application Submittal
 |
| J.01k. | Establish procedures, as necessary, so t...
 |
 |
 |
 |
 | Pending Application Submittal
 |