| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN |
| E.47. | Prepare a TSM Plan, which could include ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999.
 |
| E.47a. | Shuttle Bus System
Operate shuttle bu...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47b. | Transit Pass Sales
Sell transit passe...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47c. | Employee Transportation Subsidies
Pro...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47e. | Secure Bicycle Parking
Provide secure...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47f. | Appropriate Street Lighting.
Ensure t...
 | 10/10/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47g. | Transit, Pedestrian and Bicycle Route In...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| E.47h. | Parking Management Guidelines
Establi...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/4/1999
 | 5/4/1999 Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.08 FOURTH STREET/KING STREET |
| E.08a. | Widen the eastbound approach to provide ...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.08b. | Reconfigure the existing traffic signal....
 | 9/25/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.08c. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/16/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19 FIFTH STREET/KING STREET |
| E.19a. | Narrow approximately 250 feet of the med...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19b. | Restripe the I-280 off-ramp touchdown an...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.19c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.24 KING STREET |
| E.24a. | Widen eastbound King Street between Fift...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.24b. | Construct westbound King Street frontage...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| E.28 MUNI LINE 30-STOCKTON OR 45-UNION/STOCKTON |
| E.28a. | Construct Mission Bay Street, the Sevent...
 | 9/21/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| H.07 CORROSIVITY |
| H.07. | Test soils for sulfate and chloride cont...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/10/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.03 SEWER IMPROVEMENT DESIGN |
| K.03. | Design and construct sewer improvements ...
 |
 |
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING |
| K.06. | Structures in the Project Area should be...
 | 10/11/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06a. | Setback from the water’s edge...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06c. | Provide for dewatering basements...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06d. | Construct streets and sidewalks above ex...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06e. | Use topsoil to raise the level of public...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| K.06f. | Use half-basements and partially depress...
 | 10/19/2000
 | 10/26/2000
 |
 | 2/14/2001
 | Pending Construction and Inspection
 |
| L.01 SALT MARSH WETLAND HABITAT MITIGATION PLAN |
| L.01. | Prepare and implement a salt marsh wetla...
 |
 |
 |
 | 1/13/2000
 | Improvements will not involve work in the Channel
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.01 LIGHTING AND GLARE |
| D.01. | Design parking structure lighting to min...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| D.03 ARCHAEOLOGICAL RESOURCES |
| D.03. | Retain the services of an archaeologist,...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.07 PEDESTRIAN-LEVEL WINDS |
| D.07. | Require a qualified wind consultant to r...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| D.08 SHADOWS |
| D.08. | The Redevelopment Plan documents would r...
 | 9/25/2000
 | 10/26/2000
 |
 |
 | Pending Design Submission
 |
| G.01 NOISE REDUCTION IN PILE DRIVING |
| G.01. | Use noise-reducing pile driving techniqu...
 |
 |
 |
 |
 | Pending Building Site Permit(s)
 |
| L.02 WETLAND HABITAT AVOIDANCE |
| L.02. | Avoid salt marsh wetland habitat along t...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.03 CONSTRUCTION DURING PACIFIC HERRING SPAWNING SEASON |
| L.03. | Do not conduct any construction activiti...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.04 TURBIDITY PREVENTION |
| L.04. | Require the construction contractor to u...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.05 CONSTRUCTION IN CHANNEL |
| L.05. | Confine resuspended sediments from const...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| L.06 REMOVAL AND DISPOSAL PLAN |
| L.06. | Prepare a written plan for removal and d...
 |
 |
 |
 |
 | Improvements will not involve work in the Channel
 |
| M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION |
| M.02a. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02b. | Install water conserving dishwashers and...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02c. | Incorporate water efficient laboratory t...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02d. | Provide information to residences and bu...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02e. | Install water conserving irrigation syst...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| M.02f. | Design landscaping using drought resiste...
 |
 |
 |
 |
 | Pending Site Permit(s)
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| E.08 FOURTH STREET/KING STREET |
| E.08a. | Widen the eastbound approach to provide ...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.08b. | Reconfigure the existing traffic signal....
 | 9/25/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.09 FOURTH STREET/BERRY STREET |
| E.09a. | Restripe the westbound approach to provi...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.09b. | Restripe the northbound approach to prov...
 | 10/16/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.09c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.09d. | Install “Don’t Block the Box” signs....
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.19 FIFTH STREET/KING STREET |
| E.19a. | Narrow approximately 250 feet of the med...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.19b. | Restripe the I-280 off-ramp touchdown an...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.19c. | Reconfigure the existing traffic signal....
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| E.23 FOURTH STREET |
| E.23a. | Widen Fourth Street between China Basin ...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP) |
| K.01. | Develop and implement a comprehensive St...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
 |
| K.01a. | Minimize dust during demolition, grading...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01b. | Minimize wind and water erosion on tempo...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01c. | Minimize the area and length of time dur...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01d. | Prevent the release of construction poll...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01e. | As needed, install filter fences around ...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01f. | Follow design and construction standards...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01g. | Install and maintain sediment and oil an...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01h. | Clean wheels and cover loads of trucks c...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| K.01I. | Implement a hazardous material spill pre...
 | 10/10/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Submission of Site Specific SWPPP
 |
| Mitigation Measure | RBF Review Date | City Review Process | Approval Date | Implementation |
| Submitted | Review Completed |
| D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM |
| D.04. | Develop archaeological exploration progr...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.04a. | Define specific research parameters and ...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.04b. | Examine large-scale exposure of soil pro...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.04c. | Complete detailed field records, includi...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.04d. | Complete a detailed report of findings t...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| D.06 UNKNOWN ARCHAEOLOGICAL REMAINS |
| D.06. | The entire Mission Bay Project Area has ...
 | 9/25/2000
 | 10/26/2000
 |
 | 7/6/2000
 | 7/6/2000 Pending City Action
 |
| F.02 CONSTRUCTION PM |
| F.02a. | Water all active construction areas at l...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02b. | Use tarpaulins or other effective covers...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02c. | Pave, apply water three times daily, or ...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02d. | Sweep all paved access routes, parking a...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02e. | Sweep streets daily (preferably with wat...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02f. | Hydroseed or apply (non-toxic) soil stab...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02g. | Enclose, cover, water twice daily or app...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02h. | Limit traffic speeds on unpaved roads to...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02I. | Install sandbags or other erosion contro...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Subdivision Map and Improvement Plan Approval
 |
| F.02j. | Replant vegetation in disturbed areas as...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Subdivision Map and Improvement Plan Approval
 |
| F.02k. | Install wheel washers for all exiting tr...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02l. | Install wind breaks, or plant trees / ve...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| F.02m. | Suspend excavation and grading on large ...
 | 10/11/2000
 | 10/26/2000
 |
 | 3/12/2001
 | Pending Construction and Inspection
 |
| J.01 RISK MANAGEMENT PLAN(S) |
| J.01. | Prior to any site development activities...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | 5/25/1999 Completed
 |
| J.01a. | RMP Enforcement
Provide an enforcement ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | Timing of implementation triggered by City Fire Department review of cumulative development.
 |
| J.01b. | Pre-Development
Include, at a minimum...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01c. | For areas where ITLs are exceeded, ident...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01d. | Development
Include in the RMP, health ...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01e. | Identify site access controls to be impl...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01f. | Identify protocols for managing soil dur...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01g. | Identify protocols for managing groundwa...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01h. | Include SWPPP requirements and BMPs as d...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01j. | Develop and describe procedures for impl...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |
| J.01k. | Establish procedures, as necessary, so t...
 | 9/25/2000
 | 10/26/2000
 |
 | 5/25/1999
 | See Implementation Notes for J.01a.
 |