Mission Bay
San Francisco, CA

Block Summary Report

Block: X01
Click here to view a Printable Summary Report.
If you do not have Adobe Acrobat Reader, please click on the link to download the free plug-in.

Applicable Phase: Major Phase
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...




Pending Application Submittal
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...




Pending Application Submittal
E.47 TRANSPORTATION SYSTEM MANAGEMENT (TSM) PLAN
E.47f.Appropriate Street Lighting. Ensure t...




A conceptual TSM and strategic plan was prepared and subsequently approved on May 4, 1999. Implementation of the specific measures within the Conceptual TSM may be applied to individual sites as determined by the TMA.
E.47g.Transit, Pedestrian and Bicycle Route In...




See Implementation Notes for E.47f.
E.49 FERRY SERVICE
E.49.Ferry Service Make a good faith effor...




Pending Application Submittal
F.01 TSM MEASURES
F.01.Implement measures to decrease vehicle t...




Pending Application Submittal
H.05 NEW FIRE STATION
H.05.At the time the San Francisco Fire Depar...




Timing of implementation triggered by City Fire Department review of cumulative development.
M.06 CONSTRUCT NEW FIRE STATION AND PROVIDE NEW ENGINE COMPANY
M.06a.Construct New Fire Station Construct or...




Timing of implementation triggered by City Fire Department review of cumulative development.
M.06b.Provide New Engine Company Provide or p...




Timing of implementation triggered by City Fire Department review of cumulative development.


Applicable Phase: Tentative Map
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
E.31 SEVENTH STREET/BERRY STREET
E.31a.Restripe the eastbound approach to provi...




Pending Application Submittal
E.31b.Restripe the northbound approach to prov...




Pending Application Submittal
F.01 TSM MEASURES
F.01.Implement measures to decrease vehicle t...




Pending Application Submittal
H.07 CORROSIVITY
H.07.Test soils for sulfate and chloride cont...




Pending Application Submittal
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...




A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...




See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...




See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...




See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...




See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...




See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...




See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...




See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...




See Implementation Notes for K.01a.
K.03 SEWER IMPROVEMENT DESIGN
K.03.Design and construct sewer improvements ...




Pending Application Submittal
K.04 ALTERNATIVE TECHNOLOGIES TO IMPROVE STORMWATER DISCHARGE QUALITY
K.04.Implement alternative technologies or us...




Pending Application Submittal
K.05 CENTRAL/BAY BASIN STORMWATER MANAGEMENT PROGRAM
K.05.Develop and implement a Stormwater Manag...





K.06 STRUCTURE PLACEMENT AND DESIGN TO MINIMIZE DANGERS OF FLOODING
K.06.Structures in the Project Area should be...




Pending Application Submittal
K.06a.Setback from the water’s edge...




Pending Application Submittal
K.06b.Install seawalls, dikes, and/or berms du...




Pending Application Submittal
K.06c.Provide for dewatering basements...




Pending Application Submittal
K.06d.Construct streets and sidewalks above ex...




Pending Application Submittal
K.06e.Use topsoil to raise the level of public...




Pending Application Submittal
K.06f.Use half-basements and partially depress...




Pending Application Submittal
L.01 SALT MARSH WETLAND HABITAT MITIGATION PLAN
L.01.Prepare and implement a salt marsh wetla...




Pending Application Submittal
M.04 SEWERS AND WASTEWATER TREATMENT
M.04.Construct a fence around any interim sur...




Pending Application Submittal
M.05 STORMWATER RUNOFF CONTROL AND DRAINAGE
M.05.Drain stormwater runoff (up to a 5-year ...




Pending Application Submittal


Applicable Phase: Project Level Review
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.01 LIGHTING AND GLARE
D.01.Design parking structure lighting to min...




Pending Application Submittal
D.03 ARCHAEOLOGICAL RESOURCES
D.03.Retain the services of an archaeologist,...




Pending Application Submittal
K.02 CHANGES IN SANITARY SEWAGE QUALITY
K.02.In addition to developing and implementi...




Pending Application Submittal
L.02 WETLAND HABITAT AVOIDANCE
L.02.Avoid salt marsh wetland habitat along t...




Pending Application Submittal
L.03 CONSTRUCTION DURING PACIFIC HERRING SPAWNING SEASON
L.03.Do not conduct any construction activiti...




Pending Application Submittal
L.04 TURBIDITY PREVENTION
L.04.Require the construction contractor to u...




Pending Application Submittal
L.05 CONSTRUCTION IN CHANNEL
L.05.Confine resuspended sediments from const...




Pending Application Submittal
L.06 REMOVAL AND DISPOSAL PLAN
L.06.Prepare a written plan for removal and d...




Pending Application Submittal
M.02 WATER CONSERVATION IN BUILDINGS AND IRRIGATION
M.02.Include methods of water conservation in...




Pending Application Submittal
M.02e.Install water conserving irrigation syst...




Pending Application Submittal
M.02f.Design landscaping using drought resiste...




Pending Application Submittal


Applicable Phase: Improvement Plan - Plan Check
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
J.01 RISK MANAGEMENT PLAN(S)
J.01l.Post-Development Except where testing d...




See Implementation Notes for J.01a.
K.01 STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)
K.01a.Minimize dust during demolition, grading...




A Conceptual SWPPP was prepared and completed by California Soil & Environmental Consultants Inc. on November 1999. Implementation of the specific measures within the plan may be applied to individual sites as determined by the PUC.
K.01b.Minimize wind and water erosion on tempo...




See Implementation Notes for K.01a.
K.01c.Minimize the area and length of time dur...




See Implementation Notes for K.01a.
K.01d.Prevent the release of construction poll...




See Implementation Notes for K.01a.
K.01e.As needed, install filter fences around ...




See Implementation Notes for K.01a.
K.01f.Follow design and construction standards...




See Implementation Notes for K.01a.
K.01g.Install and maintain sediment and oil an...




See Implementation Notes for K.01a.
K.01h.Clean wheels and cover loads of trucks c...




See Implementation Notes for K.01a.
K.01I.Implement a hazardous material spill pre...




See Implementation Notes for K.01a.


Applicable Phase: Building Site Permit
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
D.04 ARCHAEOLOGICAL EXPLORATION PROGRAM
D.04.Develop archaeological exploration progr...




Pending Application Submittal
D.04a.Define specific research parameters and ...




Pending Application Submittal
D.04b.Examine large-scale exposure of soil pro...




Pending Application Submittal
D.04c.Complete detailed field records, includi...




Pending Application Submittal
D.04d.Complete a detailed report of findings t...




Pending Application Submittal
D.06 UNKNOWN ARCHAEOLOGICAL REMAINS
D.06.The entire Mission Bay Project Area has ...




Pending Application Submittal
F.02 CONSTRUCTION PM
F.02.As conditions of construction contracts,...




Pending Application Submittal
F.02a.Water all active construction areas at l...




Pending Application Submittal
F.02b.Use tarpaulins or other effective covers...




Pending Application Submittal
F.02c.Pave, apply water three times daily, or ...




Pending Application Submittal
F.02d.Sweep all paved access routes, parking a...




Pending Application Submittal
F.02e.Sweep streets daily (preferably with wat...




Pending Application Submittal
F.02f.Hydroseed or apply (non-toxic) soil stab...




Pending Application Submittal
F.02g.Enclose, cover, water twice daily or app...




Pending Application Submittal
F.02h.Limit traffic speeds on unpaved roads to...




Pending Application Submittal
F.02I.Install sandbags or other erosion contro...




Pending Application Submittal
F.02j.Replant vegetation in disturbed areas as...




Pending Application Submittal
F.02k.Install wheel washers for all exiting tr...




Pending Application Submittal
F.02l.Install wind breaks, or plant trees / ve...




Pending Application Submittal
F.02m.Suspend excavation and grading on large ...




Pending Application Submittal
F.02n.Limit the area subject to excavation, gr...




Pending Application Submittal
J.01 RISK MANAGEMENT PLAN(S)
J.01.Prior to any site development activities...




See Implementation Notes for J.01a.
J.01a.RMP Enforcement Provide an enforcement ...




Timing of implementation triggered by City Fire Department review of cumulative development.
J.01b.Pre-Development Include, at a minimum...




See Implementation Notes for J.01a.
J.01c.For areas where ITLs are exceeded, ident...




See Implementation Notes for J.01a.
J.01d.Development Include in the RMP, health ...




See Implementation Notes for J.01a.
J.01e.Identify site access controls to be impl...




See Implementation Notes for J.01a.
J.01f.Identify protocols for managing soil dur...




See Implementation Notes for J.01a.
J.01g.Identify protocols for managing groundwa...




See Implementation Notes for J.01a.
J.01h.Include SWPPP requirements and BMPs as d...




See Implementation Notes for J.01a.
J.01I.Include a requirement that construction ...




See Implementation Notes for J.01a.
J.01j.Develop and describe procedures for impl...




See Implementation Notes for J.01a.
J.01k.Establish procedures, as necessary, so t...




See Implementation Notes for J.01a.


Applicable Phase: Cert. Of Occupancy
Mitigation Measure RBF Review Date City Review Process Approval Date Implementation
Submitted Review Completed
H.01 HEAVY EQUIPMENT STORAGE
H.01.During the build-out period, store heavy...




Pending Application Submittal
J.01 RISK MANAGEMENT PLAN(S)
J.01n.Prohibit access to native soils for priv...




See Implementation Notes for J.01a.
J.01o.Prohibit the use of shallow groundwater ...




See Implementation Notes for J.01a.